Accomplished Projects


 
January 22, 2026
Two Teja: AWOS – Installation and Commissioning.MS engineers mobilized to Labuan, Malaysia, and boarded the vessel Two Teja to carry out installation and commissioning of the Automated Weather Observation System (AWOS) for Two Offshore Marine.
Click to Zoom

 
December 20, 2025
Guangzhou Salvage (CGS):Hammer Cap Insert Plate Fabrication.CGS commissioned MS welders to fabricate hammer cap insert plates precisely to their operational pipe design. Despite the urgent schedule, we completed the job on time with high-quality workmanship, exceeding customer requirements in both performance and delivery.
Click to Zoom

 
December 17, 2025
PP 9 – Tanker.At the SKL anchorage area, the MS team boarded the vessel via pilot boat to address three issues while the vessel achorage: the generator control system, the gearbox actuator, and most importantly, the steering gear control system. Our team covered both mechanical and electrical scopes of work, and all jobs were successfully completed on 15 December 2025.
Click to Zoom

 
November 20, 2025
M.V. DANZIGERGRACHT.Loading Condition, Stowage & Lashing Survey. 98 Packages – “Legends & Delta Blues” Project – Laem Chabang Port, Thailand. We deployed competent and qualified marine surveyors to carry out a comprehensive loading survey covering cargo condition, stowage, and lashing all cargo packages. Our surveyors monitored the operation around the clock over several days to ensure all cargo was safely, securely, and properly stowed and lashed prior to the vessel’s departure into open sea.
Click to Zoom

 
November 19, 2025
Pacific Honour.Pre-load Conditions, Loading, Stowage, and Lashing Survey of Critical Items for GOLAR MK II FLNG Project at Sriracha Habour, Thailand. Job is performed completely.
Click to Zoom

 
November 16, 2025
BKK 8.The condition survey was completed at anchor off Koh Sichang, Chonburi, Thailand, and the report has been delivered to the owner, respectively.
Click to Zoom

 
October 16, 2025
Tan Cang 89. Cement Bulk Compressor Soft Starter Replacement.MS supplied and installed a new soft starter for the cement bulk air-compressor system. The soft starter was configured and parameterized to match the compressor motor’s specifications and operating requirements. The job has been completed successfully.
Click to Zoom

 
October 9, 2025
SMS Stanza–Yangon, Myanmar. MS arranged LSA services for the vessel in Myanmar, including: Fixed CO₂ system and pilot cylinder servicing. Emergency Escape Breathing Device (EEBD) servicing. Self-Contained Breathing Apparatus (SCBA) servicing. Fireman’s outfit inspection. Rescue boat inspection and davit sheave renewal. Job is performed completely and meet the vessel requirements.
Click to Zoom

 
September 23, 2025
BAN QIAN BO GONG 8 HAO.Floating Dock Survey. Our surveyor conducted a condition survey of the floating dock in Si Racha, Chonburi, Thailand. The inspection covered mooring equipment, control systems, generators, support equipment, and associated accessories. The survey was completed successfully, with all key components assessed for condition and functionality.
Click to Zoom

 
September 21, 2025
SC Galaxy & SC Emerald.Winch Load Cell Verification. The winch load-cell tension pull test and calibration have been successfully completed. These tests confirm accurate tension readings to ensure safe operations.
Click to Zoom

 
September 19, 2025
Hua Tai Barge (CGS).The class-certified welding work has been completed, UT inspection is conducted., and the required bollard fabrication and installation were also successfully finished. Our skilled MS welding team delivered beyond expectations, achieving class certification and approval ahead of schedule.
Click to Zoom

 
September 15, 2025
Hua Tai Barge.CGS-Another of our standout projects, featuring certified welding inside the ballast tank and the installation of new deck bollards.
Click to Zoom

 
September 9, 2025
COSCO and Guangzhou Salvage.Marine Services (MS) was engaged by COSCO and Guangzhou Salvage to survey and assess damage on the Hua Tai barge. Our team traveled by high-speed crew boat (TMS Chana) to the vessel at the Songkhla anchorage. Thanks to the crews’ cooperation, the survey was completed smoothly and without incident. MS is ready to proceed with the repairs in line with the client’s requirements.
Click to Zoom

 
September 8, 2025
TC Uranus. Fire Alarm Control System (Thorn 1216C) — Job Completion Location: Prateep Jetty, Songkhla. Scope: Troubleshoot the Thorn 1216C fire alarm control panel and verify full system functionality. Action: MS team boarded the vessel, diagnosed and rectified faults, reset the panel, and tested detectors/MCPs, sounders, zones, and power supply. Result: All fire alarm functions operate normally and meet vessel requirements. Job completed..
Click to Zoom

 
September 8, 2025
Swiber Venturer. Fire Alarm Control System (Tyco 1016). Our team boarded the vessel at Southern Jetty, Songkhla, to troubleshoot and restore the fire alarm system. All faults were rectified and the Tyco 1016 panel was returned to normal operation. Functional testing—zones, manual call points, detectors, sounders, and power-supply/battery—was completed with satisfactory results. Job completed.
Click to Zoom

 
August 3, 2025
TC Dragon.Pitch Problem? Fixed Fast. When TC Dragon experienced inaccurate CPP pitch readings—showing zero while still moving—our MS team boarded promptly. We diagnosed the issue by checking control stations in the wheelhouse and engine control room, then verified the actual pitch angle in the gearbox room. The root cause? Mismatched readings between indicators and actual pitch. Our team recalibrated and aligned all systems.
Click to Zoom

 
July 26, 2025
U. Advantage.MS Team Activities During This Port Call. The MS team carried out two major tasks during this port call: The bunker flow meter is a large and complex piece of equipment that is difficult to remove for calibration at a workshop or onshore facility. To address this, we applied our ultrasonic calibration methodology, allowing us to complete the calibration without removing the flow meter. The task was successfully completed onboard.
Click to Zoom

 
July 25, 2025
Uniexpress 10 (UE.10).Real-Time Flow Meter System Upgrade. The MS team upgraded the real-time flow meter system by removing the PLC modules and installing IO cards to monitor engine speed. This upgrade provides improved reliability and easier maintenance. The work was carried out while the vessel was in dry dock at Unithai Shipyard, Songkhla Province.
Click to Zoom

 
June 17, 2025
TC Uranus (Under Tan Cang Offshore - Vietnam).Perform the winch load cell and calibration, job is completed.Tension Pull Testing, Accurate Load Cell Calibration, Fast, Certified, On-Site Service and Full Compliance & Detailed Reports. Precision-Safety-Trust.
Click to Zoom

 
June 15, 2025
M.Endurance – Verification and Validation of Real-Time Flow Meter Consumption System.The real-time flow meter consumption system will be verified and validated to ensure that all components, modules, equipment, and the overall system are fully operational and ready for offshore deployment. This is to meet customer requirements and operational standards. Therefore, the MS team has been assigned to board the vessel and carry out this task.
Click to Zoom

 
June 15, 2025
Express 101 – Center Main Engine (CME) Alignment and Shockfast Setting Work.The alignment of the Center Main Engine (CME) on Express 101 is to be carried out, along with the shockfast setting job. After performing an inspection using laser alignment tools to assess the condition of the CME, it was determined that the shockfast material at the engine base needs to be re-fabricated. Therefore, shockfast rework is required as part of this alignment job.
Click to Zoom

 
May 24, 2025
TC Venus - Vietnam.The MS team was urgently requested to board the vessel TC Venus in Vung Tau, Vietnam, to address issues with the Notifier fire alarm control system. We responded promptly and proceeded onboard to troubleshoot and identify the root causes of the problem. Upon inspection, we found that the fire alarm control system's program was corrupted, detectors were malfunctioning. The issues were addressed accordingly, and the system was successfully restored on May 22, 2025.
Click to Zoom

 
May 23, 2025
Jaka Tarub (Crude oil tanker from Indonesia).operating for Vaelula Energy, MS has reached a major milestone with the successful completion of the Quick Release Hook Tension and Control System project. This system had experienced chronic issues for years. The MS team stepped in to restore it to full operational status, in line with its original design. We supplied the HMI, PLC, and control system equipment, and also calibrated the load pin to bring the system back to proper working condition.
Click to Zoom

 
May 16, 2025
Daya Ceria (Vessel from Malaysia).Transfer Flow Meter Calibration Using Ultrasonic Tools (Without Removing the Flow Meter) One of the methods for calibrating transfer flow meters is by using ultrasonic tools, which eliminates the need to remove large and heavy flow meters from the vessel. Our team is fully equipped to perform this service onboard. The job was successfully completed on 16 May 2025 at Sirichol Jetty, Songkhla, Thailand.
Click to Zoom

 
May 15, 2025
SC Glory 7.Bunker (Transfer) Flow Meter Calibration - Completed. Why is bunker flow meter calibration required? Bunker flow meter calibration is essential to ensure accurate measurement of fuel quantity during bunkering operations. Over time, flow meters can drift from their original accuracy due to factors like wear and tear, contamination, or mechanical changes. Calibration helps to Ensure Measurement Accuracy.
Click to Zoom

 
May 12, 2025
Tan Cang 89 (Vietnamese vessel).The MS team was requested to perform the annual service on the Anschütz gyro compass, which requires careful attention to both mechanical and electronic components. The service was carried out by qualified technicians, as it involves precision navigation equipment. All three units onboard were successfully serviced.
Click to Zoom

 
May 12, 2025
Rawabi Opal (Vessel from Indonesia).The soft starter for the power pack is damaged and cannot properly operate the winch motors. Repairing or replacing the same model is challenging due to its outdated design. Therefore, MS has proposed a brand-new soft starter model as a replacement. MS engineers boarded the vessel to install and configure the new soft starter to match the motor specifications. The work was successfully completed, and all winch functions have returned to normal.
Click to Zoom

 
May 7, 2025
TC Royal.The soft starter in the mud pump system encountered a problem and was unable to start the pump as required. The MS team was requested to supply new soft starter and urgently dispatched onboard at the SKL anchorage area to address the soft starter issue accordingly. A soft starter in a mud pump system controls the electric motor that drives the pump, ensuring a smooth startup while minimizing mechanical and electrical stress.
Click to Zoom

 
May 7, 2025
M.V. AAL LIMASSOL.Loading, Stowage, and Lashing Survey of HRSG Module Box Assembly and Accessories at Laem Chabang C-0 Port, Chonburi, Thailand. Our surveyor attended M.V. AAL LIMASSOL at Laem Chabang Port to inspect and witness the loading, stowage, and lashing of all 57 cargo packages scheduled for shipment. The loading and securing of the cargo were completed satisfactorily, ensuring the vessel's safe departure to the destination port.
Click to Zoom

 
May 6, 2025
TC Uranus (Tan Cang Offshore Company, Vietnam.Troubleshooting CPP Pitch Difference from Control Lever and addressed the issue accordingly.
Click to Zoom

 
May 6, 2025
UE.24.MS was requested to perform the SME alignment, which is critical to maintaining optimal engine condition. The alignment was successfully completed in accordance with the vessel's engine design.
Click to Zoom

 
April 22, 2025
AWOS (Automated Weather Observation System). We are currently managing the system on an accommodation barge in Bintulu, Sarawak, Malaysia, fully in accordance with the customer's requirements. Today, we are second to none in our ability to handle this system.
Click to Zoom

 
April 6, 2025
Monarch 1 (AESEN). "Coriolis Bunker Flow Meter" Installation & Commissioning at ASIMA dockyard, Samutprakarn pronvince, is completed. So, the fuel could be easy tracking online to get the volume while the vessel doing bunkering.
Click to Zoom

 
April 2, 2025
Two Eastwind - Johor river, Malaysia. MS team is requested to go to Malaysia to install and commission the AWOS (Automated Weather Observation System) to support helicopter operation for accomodation barge to meet CAP437 requirements for helicopter operations.
Click to Zoom

 
March 27, 2025
Tan Cang 89. Having the stern thruster control issue cause the vessel not able to control the pitch angle properly, TCO asked MS team onboard to address the problem immediately. Problem is fixed , the vessel then able to go to work for offshore operations as normal.
Click to Zoom

 
March 22, 2025
EKSPRES 93 (IMO: 9782481) is a Crew Boat and is sailing under the Myclyn Express Offshore, Malaysia. Her length overall (LOA) is 40 meters and her width is 7.6 meters.We performed the laser alignment & vibration check for the main engines, gearbox and FiFi pump after the engines & gearbox replacement. Job is done completely.
Click to Zoom

 
March 22, 2025
Daya Ceria.Oil service / PSV, IMO 9680451.MS team performed the load cell tension pull test and calibration on the vessel Daya Ceria under the Keyfield Offshore company. The vessel was built in 2021, and is sailing under the flag of Malaysia. Her length overall (LOA) is 60 meters, and her width (beam) is 16 meters. Her summer deadweight capacity is 1,451 tonnes.
Click to Zoom

 
March 20, 2025
BBC AMBER.Cargo discharge from from the vessel, loading on trailers for road transport and unloading from trailers. All's completed as planned.
Click to Zoom

 
March 17, 2025
Oil boom fender.for Sawat jetty which high standard required for oil spill protection. Already delivered safely. Foam filled fenders - we are also preparing to import the foam filled fenders to deliver to PSB (Petroleum Development Support Base) under PTTEP.
Click to Zoom

 
March 16, 2025
M. Monarch 2.Check and address the Flow meter monitoring system. Problem is informed that the main engine speed is error, need MS engineer to onbaord to check and rectify the issue ASAP. Our engineer immeadiately travel to Sattahip to pinpoint the cause, then fix the issue to get all the parameters back to normal condition.
Click to Zoom

 
Febuary 26, 2025
Miclyn Energy.Coriolis flow meters calibration has been performed completely. This calibration job is required to ensure the flow meters are reading accurately and the ship owner is able to evaluate and plan for engines consumption and also plan maintenance efficiently.
Click to Zoom

 
Febuary 24, 2025
SC Glory 1.The engine speed control parts & system is requried to maintenance properly. That's the reason our customer like SC always get our team to perform the annual service to ensure all system modules are in good condition & functions. Team performed the engine speed control system annual service completely.
Click to Zoom

 
Febuary 23, 2025
Shelf Drilling Krathong.Marine Service cooperates with Promp NDT performed the Draw work break alignment job on jack up rig, Krathong (SDK). Job is performed completely and meet the rig requirements.
Click to Zoom

 
Febuary 21, 2025
Swiber Sapphire.The winch motors control which has chronic abnormalities for long time, MS engineer has clearly solved the problems completely. Meet all the vessel operations. Laemchabang port.
Click to Zoom

 
Febuary 16, 2025
M. Vigilant.Loadcell tenstion calibration and comparison pull test for the winch control system is done.
Click to Zoom

 
Febuary 16, 2025
AAL Busan.Cargo loading, lashing & sea fastening survey is done completely. This process is critical for the cargoes and packages (goods) to be safe before the vessel departure in rough sea.
Click to Zoom

 
Febuary 6-12, 2025
TC Saturn.Flow meter installation & commissioning. MS team onboard the vessel at Sattahip port to install flow meters for main engines and auxiliary engines on TC Saturan, job is completely done as needed.
Click to Zoom

 
Febuary 6, 2025
AWB Rajawali.The motion sensor and automated weather observation system is removed from the vessel safely & ready to install on next vessel in Malaysia by MS team.
Click to Zoom

 
Febuary 6, 2025
TC Uranus.The flow meters repairing and installation job is done completely.
Click to Zoom

 
January 21, 2025
Tan Cang 89.The flow meters calibration job is done completely and meet all the customer requirements. We have done for the removal the flow meters from the vessel, perform the calibration in MS workshop, then install back to the vessel, respectively.
Click to Zoom

 
January 17, 2025
BBC LEER.One more loading stowage and lashing survey of 2 x Ethane storage bullets and general cargo packages onboard M.V. BBC LEER.
Click to Zoom

 
January 17, 2025
MSC ISTANBUL.The cargoes loading survey of the project Vogt Power International - V28451 Los Medanos Shipment which required seriously inspection to ensure all packages are safe and in good condition while shipping. All's good as a plan.
Click to Zoom

 
December 12, 2024
PT Limin Swordfish.There is a problem for real time fuel consumption monitoring system while the vessel is working offshore, MS team travelled offshore to onboard and address the issue completely.
Click to Zoom

 
December 12, 2024
TC Mermaid.Encountered the engine load issue which need input data to provide for real time flow meter fuel consumption monitoring system. MS engineer perform the excellent job at Sattahip port on 8 Dec 2024 successfully.
Click to Zoom

 
December 12, 2024
Express 73.The bow thruster tunnel crack and urgently request MS team to address the problem. We response all customer request ASAP and meet all DNV-GL class inspection and verification.
Click to Zoom

 
December 12, 2024
Geo Sovereign.Under MS operations to handle all pipes and BHA inspections, recut, repair and recondtion (good collaborate with Prompt NDT & OMS) for the drilling survey vessel. All's meet the customer requirments.
Click to Zoom

 
November 24, 2024
Swiber Sapphire.The issue of the winch motors tripped while starting the winch is solved. The winch operation is back to normal.
Click to Zoom

 
November 13, 2024
FSO Jaka Tarub.The Quick Release Hook control system on FSO Jaka Tarub has been not working for long time, MS team is called onboard to troubleshoot to find the solutions to address the issue. We identified & cleared the issue to address the problem.
Click to Zoom

 
November 4, 2024
The loading survey. for all packages to load on BBC Seine is completed safely & securely.
Click to Zoom

 
October 23, 2024
SC Emerald.The annual Loadcell Tension Pull Test is performed completely.
Click to Zoom

 
October 23, 2024
The loading survey jobs.Starting from the maufacturer plant until lifting all packages onbaord. All's done safetly & completely yesterday.
Click to Zoom

 
September 20, 2024
UE.22.address the issue of 3 main engines, Badouin, controller displays unable to read, found the display module are out of order.
Click to Zoom

 
September 19, 2024
TC Royal.MS cooperate with Anschütz representative completely the Gyro sphere replacement and configuration to meet the vessel DP operation, meet all customer requirements.
Click to Zoom

 
September 14, 2024
PTTEP.the Erawan generator engine overhaul job is on going.
Click to Zoom

 
September 7, 2024
Geo Sovereign.the urgent request to address pending issues on Geo Sovereign ie., the air strorage pumps, motors, power pack control system due to abnormal fucntions, welding jobs, etc., MS team is called onboard urgently to fix all pending problems within limited time before the vessel departure. All problem are fixed, completely.
Click to Zoom

 
August 30, 2024
AWB Rajawali.the motion monitoring system is installed on AWB Rajawali completely and ready to support helicopter operations.
Click to Zoom

 
August 22, 2024
The shipyard survey job.at Blue Oceanic Shipyard in Trang province, Kantrang, Thailand, to level up the Quality Management System (QMS) and so on. Great cooperation, team work & managements bring to success.
Click to Zoom

 
August 21, 2024
UE.14, The alignment job for Fire Fighting pump & Center Main Engine on UE.14 is completed. The sea trial is performed to check the equipment & vibration condition after job is done. All's good meet the vessel operations and requirements.
Click to Zoom

 
August 18, 2024
AWB Rajawali - Automated Weather Observing System (AWOS) equipment & installation is requried to support helicopter operations.MS is assigned to supply equipment, install and commisioining the system onboard in further.
Click to Zoom

 
August 17, 2024
PTTEP - PSB jetty, the front fenders fabrication job is completed and ready for installation.The addtional requried ganway and ladder is also completed, ready to deliver next week. All's good in time frame as planned.
Click to Zoom

 
August 15, 2024
TC Sapphire, Winch loadcell Tension pull test & Calibration has been done completely.Winch loadcell tension reading is calibrated and read accurately.
Click to Zoom

 
August 15, 2024
SC Galaxy: The loadcell of winch tension and calibraiton test has been done completely.This test is requried to ensure the tension reading is accurate for operation and safety reasons. All's done completely this afternoon.
Click to Zoom

 
August 14, 2024
SC Glory 3, We cooperate and work with Kobelt authorzied person to check.inspect and address the main engine control system on SC Glory 3, ensure all meet the client's request and requirements. Job is completed, tested and the vessel is ready to go offshore.
Click to Zoom

 
August 8, 2024
TC Neptune.We supplied provision to TC Neptune yesterday for full package & ensure able to support crew & passenger for the whole month while workign offshore.
Click to Zoom

 
August 5, 2024
SC Glory 7, The flow meters calibration is one of our highligts nowsdays.We have done for serveral vessels either Transfer flow meter or Coriolis flow meter. Just completed the flow meter calibraiton for SC Glory 7 recently.
Click to Zoom

 
August 4, 2024
TC Mermaid, Besides the engineering, repairing and maintenance jobs.recently we are requested to supply full provision to the vessel to support full operations in the gulf of Thailand. Yesterday we supplied for TC Mermaid.
Click to Zoom

 
August 4, 2024
Shipment requires surveyor to attend for loading/securing of cargo on trailers at manufacturer before road transport, also loading on vessel at LCB.Road transport is planned properly & the surveyor is required all the transportation processes for this whole month of July.
Click to Zoom

 
August 1, 2024
SC Bongkot: The aligment jobs on Auxiliary engine, shaft generator and Fire Fighting pump is completed.The good performance vessel requires good alignment. Good alignment can find at MS.
Click to Zoom

 
July 28, 2024
M/V Evay: The Alarm Monitoring System is safety priority system on the vessel.We checked, troubleshooted and finally addressed the issue on M/V Evay successfully yesterday.
Click to Zoom

 
July 20, 2024
Tan Cang 89 - Encountered the main engine PLC control system problem.MS team provided full support by getting PLC module and shipped by air. Once arrive SKL, download, migrate and configure the program to match as engine design. Problem is fixed, vessel able to continue the offshore operations.
Click to Zoom

 
July 7, 2024
U.Adventure, the winch tension pull test is crucial for safety reasons.Therefore, perform the annual service and annual tension test is very important to make all parties ensure that they are working with the high reliable equipment.
Click to Zoom

 
July 6, 2024
UE.25, when there is a gearbox or engine replacement & for efficient and good conditions of rotating parts, alignment is needed.We completed the Port Main Engine alignment just now.
Click to Zoom

 
June 19, 2024
MV.Han Zhi, loading survey.The loading survey at Laemchabang for MV. Han Zhi is performed completely.
Click to Zoom

 
May 17, 2024
Provisions (food).Provisions (food) order is a new challenging from our valued customer which informed us in the morning and need to get all by the ship departure time. We made it.
Click to Zoom

 
May 15, 2024
U.Samui & TC Hai An : Winch loadcell calibration & tension test. There are 2 jobs consecutively in these 2 days for the winch loadcell calibration & tension test; • U.Samui which port call at Sattahip, Chonburi • TC Hai An at Southern jetty, Songkhla.
Click to Zoom

 
May 11, 2024
UE.16, Welding & Inspection.Welding & Inspection; Once of our very challening jobs. Not challenge only due to time limit but also the welding X-ray (RT100) inspection. Team contributed day & night to complete the job to meet our customer requirements. Finally, we made it.
Click to Zoom

 
May 11, 2024
Flow Meter Calibration. Flow Meter Calibration: One of our major jobs presently, we have the Master Coriolis Flow Meter which imported from Germany, high accuracy & reliability.
Click to Zoom

 
April 13, 2024
MV. Hydai Dubai : Loading Survey.The Loading Survey for MV.Thydai Dubai at Laem Chabang port, Chonburi, Thailand, is ongoing. To ensure all products, packings & liftings are safe, the survey & monitor is critical. We are your choice.
Click to Zoom

 
April 12, 2024
MV. Limin: Flow meters. MV. Limin : Another flow meter installation & commissioning jobs which MS team have done completely to meet the customer requirements.
Click to Zoom

 
March 16, 2024
Attending the Asia Pacific Maritime Exhibition, Marina Bay sands, Singapore. We explore the marine business and knowledge to ensure we meet all our valued customers requirements. Attending the Asia Pacific Maritime (APM) in Singapore to connect the marine manufacturers and get update information.
Click to Zoom

 
March 5, 2024
Tien Phong : Real Time Flow Meter Monitoring System (RTFMS). Another ship for the Real Time Flow Meter Installation and Commissioning on the vessel Tien Phong (Vietnam vessel). The urgent job has been completed as per customer requirements during the weekend.
Click to Zoom

 
February 17, 2024
Winch load cell pull test and calibration: Monarch 1 & Monarch 2. Monarch 1 & Monarch 2 - Winch load cell tension pull test and calibration in Sattahip, Chonburi, is completed and meet all vessel operations requirements
Click to Zoom

 
February 11, 2024
The clutch in & clucth out remotely (from the bridge) problem : M.Emperor.The problem of the cluch in/ out remotely which chronic since day 1, MS team is called onboard to troubleshoot & rectify the problem. The clutch in & clucth out remotely (from the bridge) problem is successfully fixed. The operation is back to normal.
Click to Zoom

 
February 11, 2024
Calibrate load cell : TC Dragon.An annual winch load cell test & calibration on TC Dragon is completed. All readings (load & length reading) are accurate and in a good shape. This operation makes the vessel crew working safely and comfortably while performing the anchor or towing operation.
Click to Zoom

 
February 4, 2024
We will be second to none for the PLC & Control System Thrusters (Bow & Stern): U.Adventure.The thruster control system is one of the major control systems onboard which crucial and require the accurate reading. We already addressed the problem the vessel encountered. All's good on U.Adventure.
Click to Zoom

 
January 23, 2024
High speed crew boat. (Vessel Motion Monitoring System (VMMS): Express 101.การติดตั้งระบบ VMMS บนเรือความเร็วสูง เพื่อนำข้อมูลลิงค์ข้อมูลกับ Real Time Monitoring System เรียบร้อย ทดสอบระบบผ่านเรียบร้อย meet the customer requirements. : M.Emperor.
Click to Zoom

 
January 14, 2024
Real time flow meter installation and commissioning : M.Emperor.Another mile stone for the real time flow meter system installation and commissioning on M.Emperor. With the great cooperation from crew, ship owner and MS team, job is completed as per requirements and meet time line.
Click to Zoom

 
December 20, 2023
Winposh Regent.Gearbox parts recondition, installation & commissioning on Winposh Regent is completed. Good lesson learned on this jobs for new knowledge, people communications & connections, etc. "You don’t learn to walk by following rules. You learn by doing, and by falling over" - Richard Branson.
Click to Zoom

 
December 7, 2023
Kamala Thanee.Another mile stone for MS team to supply, install and perform the commisioning for the helicopter support equipment (including weather sensors and so on) to support helicopter on accomodation barge, Kamala Thanee, to meet CAP437.
Click to Zoom

 
November 18, 2023
The winch tension pull test for SC Nata. The winch tension pull test for SC Nata at Sattahip port is completed.
Click to Zoom

 
November 16, 2023
The motion sensor & equipment to support AWOS. Another big project is ongoing, the motion sensor & equipment to support AWOS (Automated Weather Observation System) for the accommodation barge. Parts & equipment we order just arrived MS shop yesterday.
Click to Zoom

 
November 15, 2023
Fire Fighting Pump. Another challenging problem, the 80% engine load limit is trigged, then cause the function of Fire Fighting Pump pump could not engage the pump and run as needed. We troubleshooted and finally found the cause from PLC input. Fixed the problem, engine is back to normal.
Click to Zoom

 
November 7, 2023
AAL Singapore : cargoes loading survey. Cargoes loading survey for AAL Singapore at Laemchabang port, Chonburi, Thailand, is on going. The cargoes loading & lashing is crucial. There are many factors to be considered, calculated to get the best solution for loading.
Click to Zoom

 
November 6, 2023
MV. Kou Lin : challenge welding job. One of the toughest welding jobs we encountered. Many unforeseen obstacles, however we made it. MV.Kuo Lin, Our new foreign customer found MS via internet, trust and reliable is most valuable. ฟ้าหลังฝน… ยังสวยงามเสมอ “Every cloud has a silver lining”
Click to Zoom

 
November 4, 2023
MV. Kou Lin : challenge welding job. Today we are having challenge welding job on cargoes containers vessel, MV. Kuo Lin. However, we will make it happen and exceed customer requirements.
Click to Zoom

 
November 3, 2023
Pacific Innovation : cargos loading survey. The cargo loading survey is started today, some of heavy lifts (above 100 tons each) will be done tomorrow.
Click to Zoom

 
October 27-29, 2023
Winches tension pull test on Mermaid Resiliant. MS team completed the winches tension pull test on Mermaid Resiliant, there are 8 winches onboard. However, with great cooperation and well prepared for tools and equipment, therefore, the job has done completely and safely.